Madrid City Council's Great Auction of 22 Kw Electric Chargers and Fast Charging Chargers
If you represent a company looking to expand its infrastructure or you are an accredited installer, this is your opportunity to purchase high-performance electrical charging equipment from the Madrid City Council network.
In this auction you will find the perfect solution for every need: from powerful 50 kW and 60 kW fast charging stations, ideal for businesses and petrol stations that need to recharge vehicles in minutes (compatible with the CCS Combo 2 standard), to the versatile 22 kW Wallbox chargers, perfect for safe and complete overnight charging in company garages (with the universal Type 2 connector).
This is a unique opportunity to invest in robust and reliable equipment at a very competitive price, with the advantage that participation is open and no deposit is required.
Make a note of the key dates, as the auction will be active exclusively on our website.
Start date: 7 October 2025 at 10am. CEST
End date: 22 October 2025 at 11am. CEST
Don't miss the opportunity and prepare your bid.
Important note:
1) We inform you that, after being removed from the municipal facilities, it is not possible to guarantee the correct functioning of the equipment or the state of its individual components.
2) The following requirements must be fulfilled to start up the chargers:
Software: Advanced computer skills to configure the equipment with specific software that is compatible with the OCPP 1.6 communication protocol.
Hardware: To have the specific hardware for the connection and configuration of the equipment.
Connectivity: Connection to the network must be via Ethernet cable or a 3G/4G mobile phone connection.
Access: The equipment includes an RFID card reader for user login and logout.
3) Fast charging equipment is for industrial, not domestic use. Its 50 kW output exceeds the capacity of a standard residential power supply. Installation, configuration and commissioning is required in addition to the above requirements:
Integration and operability: For their operation, the equipment must be integrated into the operator's management platform. This involves providing them with network connectivity and adjusting the parameters of the communication protocol.
Documentation included: Together with the charging stations, the purchasing party will be provided with the manufacturer's official technical installation and maintenance manuals.